Real numbers from the field: over 17,000 piles at solar plants in Aswan.

15,000+

Abydos Solar Plant — Al-Raqaba, Aswan

Apr – Oct 2026

Drilling and driving of mounting-structure piles with three crawler machines on shift system (up to 15 working hours a day), with pre-drilling in rocky blocks, closing block observations and handover ready for structure installation.

3crawler machines
15+working hours a day on shifts
350+piles on the peak day
2,500+

Solar Plant — Aswan, Phase One

Feb – Apr 2026

Pre-drilling of structure piles in rocky soil with two crawler machines and two air compressors, moving between blocks on the survey schedule.

2crawler machines
2air compressors
DTHdrilling in rock
12:00 EW IS-55-91Y BLOCK 72 · ROW PITCH 7.0 m ● driven ○ pending
PILE GRID — PLAN VIEWABYDOS · ASWAN

Five steps from drawing to handover

  1. Survey & marking

    Receiving drawings, topographic survey and marking pile positions on the ground.

  2. Pre-drilling

    Where the soil is rocky or hard, to the specified diameter and depth.

  3. Driving

    To design depth, controlling verticality and level for every pile.

  4. Inspection & rectification

    Checking verticality, level and spacing; rectifying any pile outside tolerance.

  5. Handover

    Daily execution records and QA reports ready for the structure installation stage.