Real numbers from the field: over 17,000 piles at solar plants in Aswan.
Drilling and driving of mounting-structure piles with three crawler machines on shift system (up to 15 working hours a day), with pre-drilling in rocky blocks, closing block observations and handover ready for structure installation.






Pre-drilling of structure piles in rocky soil with two crawler machines and two air compressors, moving between blocks on the survey schedule.


Receiving drawings, topographic survey and marking pile positions on the ground.
Where the soil is rocky or hard, to the specified diameter and depth.
To design depth, controlling verticality and level for every pile.
Checking verticality, level and spacing; rectifying any pile outside tolerance.
Daily execution records and QA reports ready for the structure installation stage.