Machine Sales
Crawler and wheeled solar pile drivers with 4–8 m masts, supplied new with warranty, training and spare parts.
Details ›We drill and drive mounting-structure piles with hydraulic crawler machines and crews resident on site, and we sell and rent the same machines with operators.



Everything a solar plant needs from marking the first point to handing over foundations ready for structure installation.
Crawler and wheeled solar pile drivers with 4–8 m masts, supplied new with warranty, training and spare parts.
Details ›Monthly or per-project hire with operators and maintenance technicians resident on site, plus transport and air compressors when needed.
Details ›Our core work: pre-drilling, driving and rectification of mounting-structure piles priced per pile, with daily production logs and QA reports.
Details ›Genuine spare parts, hammers, drill heads and rods, with routine maintenance of machines and compressors on site or at our 10th of Ramadan yard.
Details ›
| Mast length (X) | 5.5 m |
|---|---|
| Engine power (Y) | 91 kW |
| Engine brand (Z) | Y — Yuchai |
| Drilling depth / Drilling diameter | 5.0 m / 50–400 mm |
| Hammer energy | 1,260 / 1,460 J |
| Functions | Pile driving • Pile pulling • Screw piles • Auger drilling • DTH drilling |
Three units of this model in our own fleet — available for sale and for rent with operator.

Drilling and driving of mounting-structure piles with three crawler machines on shift system (up to 15 working hours a day), with pre-drilling in rocky blocks, …
Apr – Oct 2026
Pre-drilling of structure piles in rocky soil with two crawler machines and two air compressors, moving between blocks on the survey schedule.…
Feb – Apr 2026Receiving drawings, topographic survey and marking pile positions on the ground.
Where the soil is rocky or hard, to the specified diameter and depth.
To design depth, controlling verticality and level for every pile.
Checking verticality, level and spacing; rectifying any pile outside tolerance.
Daily execution records and QA reports ready for the structure installation stage.
Thousands of piles a month with crawler machines and crews on shift systems.
Every pile checked and rectified at once, so the structure crews arrive to a ready site.
Machines, transport, operators and technicians resident on site throughout.
General contracting and electromechanical works since 2018, partner of major national projects.
Send the approximate number of piles, soil type, project location and duration, and we reply with a technical and commercial offer within 24 hours.
+20 109 999 2979sales@infisolar.net